2019年掘进接替计划表方案二(12000m)1234567891011122721303030303030303030153134北风巷煤回锚棚综掘12.23901001003212(II)切眼煤回锚支自溜+1台皮带炮掘5.012012030903151机巷煤回锚棚4台皮带综掘12.2130081060180180180180303151风巷煤回锚棚3台皮带综掘12.210001000100150150150150703155底板抽放巷岩准裸2台皮带炮掘11.216001600100801305151机巷煤回锚支2台皮带+1台溜子综掘12.24004001501501003222风巷煤回锚棚3台皮带综掘12.01500150018018018018018090561南探巷煤准锚棚矿车炮掘11.0402020312S底抽巷岩准裸1台皮带+3T矿车炮掘9.21200120080805013013013013080322变电所岩准裸矿车炮掘15.0505050322专用回风上山(含风巷回风联络巷岩准裸矿车炮掘9.03703705013013060312大巷岩开裸矿车炮掘9.0150030010080322轨道上山岩准裸矿车炮掘10.23703701301301103222进风石门岩准裸矿车炮掘12.370503224回风石门岩准裸矿车炮掘12.3200200701303222机巷揭煤及安装巷煤回锚喷矿车炮掘12.210010050503222机巷煤回锚支1台皮带综掘5016016080312N底抽巷岩准裸1台皮带+3T矿车炮掘9.21100440100801301303124进风石门岩准裸矿车炮掘10.0707050312运煤平巷岩准裸矿车炮掘9.22002003013040312煤仓扩刷岩开锚喷矿车炮掘101030掘进方式断面(m2)工程量剩余量巷道名称岩性巷道性质支护方式运输方式组别一组二组一组二组一组xxx煤矿2019年度掘进接替计划表方案二单位:米2019年度生产天数单位掘进一队掘进三队掘进五队3124进风石门揭煤软岩准锚喷矿车炮掘11.220203124运输石门岩准裸矿车炮掘10.080803121回风石门岩准锚喷矿车炮掘10.0120120312补回风上山岩准裸自溜+矿车炮掘9.026012012020312N进风上山及底抽巷岩准裸矿车炮掘9.2600530